FIELD: construction. SUBSTANCE: formed between layers of structure in process of concreting are connecting keys due to paired alternating lifting before concreting of inner partition on the side of one outer bearing layer and separating wall on the side of other bearing layer. To increase bearing capacity of erected structure, it may be reinforced with flat nets or reinforcing cages installed between partition and wall, as well as transverse ties between outer bearing layers. EFFECT: higher efficiency. 3 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF CAST-IN-SITU MULTILAYER STRUCTURES OF WALL OR COLUMN TYPE | 1993 |
|
RU2035568C1 |
METHOD OF MAKING WALL ARTICLES AS STONES AND BLOCKS MADE OF GAS CONCRETE MIXTURE | 1993 |
|
RU2045501C1 |
METHOD TO ERECT MONOLITHIC REINFORCED CONCRETE FRAMES | 2013 |
|
RU2541996C1 |
METHOD FOR ERECTION OF MONOLITHIC THREE-LAYERED FENCE AND INNER WALLS OF BUILDINGS AND FORMING SYSTEM FOR ITS REALISATION | 2008 |
|
RU2401918C2 |
METHOD FOR ERECTING MONOLITHIC WALLS BETWEEN FLOORS | 1992 |
|
RU2024712C1 |
METHOD OF REINFORCED CONCRETE STRUCTURE BUILDING WITH THE USE OF SLIDING FORMS | 2002 |
|
RU2227198C2 |
METHOD TO ERECT MONOLITHIC CONSTRUCTION STRUCTURE OF BUILDING OR FACILITY "BLISS HOUSE" | 2010 |
|
RU2440472C1 |
BUILDING STRUCTURE AND METHOD FOR ITS ERECTION | 1999 |
|
RU2170309C1 |
FIXED FORMWORK SYSTEM FOR LARGE-BLOCK CONSTRUCTION OF BUILDINGS | 2019 |
|
RU2720548C1 |
STRUCTURAL FORMWORK BLOCK FOR OPENINGS | 2013 |
|
RU2525242C1 |
Authors
Dates
1995-04-20—Published
1993-06-30—Filed