FIELD: works of large bearing-wall house building. SUBSTANCE: line has stations for installation of component members, ground coating, application of texture layer, painting and drying of panels. All stations are interconnected by chain conveyer 6 for conveyance of panels 8. The station for application of texture layer has stop 10 and a tipper in the form of hinged frame 11 and hydraulic cylinder 15. Panel 8 is conveyed by conveyer 6 from station 1 to station 5 in a position close to a vertical one (2-3 deg); only at the station for application of texture layer the panel together with frame 11 is placed on stop 10, and texture layer is applied in this position, otherwise the quality of work is sharply worsened. EFFECT: enhanced quality. 3 cl, 2 dwg
Authors
Dates
1995-05-27—Published
1992-01-27—Filed