FIELD: erection of buildings. SUBSTANCE: modules are installed on the design position within a story. Then reinforcement common for the whole story is laid and monolithic reinforced concrete floor common for all the modules is made. Then the following row of modules is installed over the floor. Pits being filled with concrete in the process of monolithic floor installation may be made to form joint tongues on outer surfaces of the floors along ribs on the boundary of adjacent walls of the modules. Prior to floor making, seams between adjacent modules are overlapped with asbestos cement sheets, which then are stayed in the floor. EFFECT: highly productive erection of buildings. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INSTALLING FLOOR SLAB IN REPAIRING BUILDING | 0 |
|
SU1754862A1 |
MONOLITHIC CONCRETE WALL | 0 |
|
SU1763602A1 |
STRUCTURAL SYSTEM OF MULTISTORY BUILDING AND PROCESS OF ITS ERECTION ( VARIANTS ) | 2000 |
|
RU2197578C2 |
FRAMEWORK OF MULTISTORIED BUILDING | 1996 |
|
RU2118430C1 |
STEEL-AND-CONCRETE FRAME OF MULTISTORY BUILDING | 2000 |
|
RU2187605C2 |
PRESTRESSED REINFORCED CONCRETE FRAMEWORK OF BUILDING | 1998 |
|
RU2133801C1 |
FRAMELESS EARTHQUAKE-RESISTANT BUILDING | 1997 |
|
RU2121049C1 |
LARGE-BLOCK BUILDING AND METHOD TO MANUFACTURE ITEMS FOR ITS ERECTION | 2012 |
|
RU2498024C1 |
ANTISEISMIC BUILDING | 1992 |
|
RU2045646C1 |
MULTISTORY BUILDING FRAME | 2004 |
|
RU2272108C2 |
Authors
Dates
1995-06-19—Published
1992-12-01—Filed