FIELD: hydraulic engineering. SUBSTANCE: concrete dam has antifiltering screen 1, bottom wedge 2, cementing curtain 3, and drain 4 in the base. Antifiltering screen 1 of the dam is of compressed concrete. Binding content in concrete mixture of the concrete is as high as 25 per cent as compared to one in that of the bottom wedge. In so doing, there is a monolithic joint on screen/wedge bound. EFFECT: highly effective building. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DAM OF ROLLED LOW-CEMENT CONCRETE | 2003 |
|
RU2263741C2 |
METHOD FOR BUILDING CONCRETE DAM | 0 |
|
SU1703777A1 |
METHOD OF DETERMINATION OF FILTRATION CHARACTERISTICS OF BEDROCK OF WATER-DEVELOPMENT WORKS | 1991 |
|
RU2021588C1 |
DAM | 0 |
|
SU1435689A1 |
EARTH DAM | 2013 |
|
RU2550885C2 |
CONCRETE GRAVITY DAM | 0 |
|
SU1458485A1 |
CONCRETE DAM AND METHOD OF ERECTING SAME | 0 |
|
SU1328424A1 |
METHOD OF ERECTING CONCRETE DAM | 0 |
|
SU1296675A1 |
METHOD FOR GROUTING CONCRETE GRAVITY DAM BUILT ON ROCK FOUNDATION | 2003 |
|
RU2233938C1 |
GRAVITY DAM | 0 |
|
SU1507904A1 |
Authors
Dates
1995-06-27—Published
1992-10-27—Filed