FIELD: mining. SUBSTANCE: primary fill is formed in making dump tier by filling rock mass at angle of natural slope. When filling next portions of rock mass on primary fill, upper slope edge layers of different fractions of dump tier are formed due to segregation of material different lumps. Dump tier is worked by subbenches in descending order with taking layers optimized in lump sizes found in the intervals of certain heights of transfer store with subsequent loading on transportation facilities directed depending on needed size fraction of rock mass. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REACTIVATION OF OPEN PIT EDGES | 1991 |
|
RU2012810C1 |
METHOD OF OPENCAST MINING OF DEPOSIT OF MINERAL RESOURCES | 0 |
|
SU1794191A3 |
METHOD FOR FORMATION OF EXTERNAL DUMP IN MINERAL OPENCAST MINING | 1990 |
|
RU2009320C1 |
METHOD FOR FORMING QUALITY OF ORES AT MINING | 0 |
|
SU1675553A1 |
RELOADING AND SORTING STORE | 1992 |
|
RU2083461C1 |
SPREADER | 0 |
|
SU1800034A1 |
METHOD OF RELOADING MINED ROCK IN COMBINED TRUCK-RAILWAY TRANSPORTATION | 2009 |
|
RU2395443C1 |
METHOD OF PREPARATION OF MOUNTAIN ROCK FOR TRANSPORTING BY BELT CONVEYERS AT CYCLIC PRODUCTION TECHNOLOGY | 0 |
|
SU825191A1 |
METHOD OF FORMATION OF OPENCAST NONMINING FLANK IN ARGILLACEOUS ROCKS | 2001 |
|
RU2208163C1 |
METHOD FOR OPENCAST MINING OF LUMPY AND SANDY-ARGILLACEOUS ROCKS | 1992 |
|
RU2039268C1 |
Authors
Dates
1995-07-09—Published
1992-11-16—Filed