FIELD: mining industry. SUBSTANCE: method includes construction of tunnel above transportation communications. Exits and pioneer embankment are formed over design outline of open pit, and successive filling of overburden rocks is made from low laying to higher laying tiers with filling of constructed tunnel. Tunnel is constructed within design outlines of dump. EFFECT: rational utilization of area for dump in locations of transportation communications owing to provision of rock filling in preset place of dump. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REFUSE DISPOSAL | 0 |
|
SU1788263A1 |
METHOD FOR OPEN EXTRACTION OF STEEP-FALLING DEPOSITS WITH INTERNAL DUMP-FORMING | 2002 |
|
RU2246620C2 |
METHOD FOR HIGH LAYERED DUMP FORMING | 2006 |
|
RU2310077C1 |
METHOD OF FORMING OUTER EXCAVATOR DUMPS | 0 |
|
SU1218111A1 |
METHOD FOR FORMING OUTSIDE RAILWAY STOCKPILES | 0 |
|
SU949177A1 |
METHOD FOR FINISHING OPENCAST IN MINING STEEPLY DIPPING MINERAL DEPOSITS | 0 |
|
SU1788251A1 |
METHOD FOR OPEN-PIT MINING OF STEEPLY DIPPING MINERAL DEPOSITS | 1989 |
|
RU2013550C1 |
METHOD OF FORMING DUMPS IN OPEN-CAST MINING OF MINERALS | 0 |
|
SU1265328A1 |
METHOD FOR INTERNAL REFUSE DISPOSAL | 0 |
|
SU1788262A1 |
METHOD AND HAULING-DUMPING UNIT FOR MAKING PIT DUMPS | 0 |
|
SU1081349A1 |
Authors
Dates
1994-03-15—Published
1990-12-26—Filed