FIELD: mining. SUBSTANCE: when forming protective pillar above diamond pipe, producing well is sunk in pipe vertical axis. Additional wells are made inclined and radial with respect to bottom of producing vertical well. Peripheral wells are made beyond the outline of formed protective pillar. Receiving chamber is formed from vertical well at roof contact. Reinforcement is used in form of wire rope whose loop is lowered through one inclined well to receiving chamber and lifted to the surface through diametrically opposite well with loop transfer and winding of wire rope on casing string of peripheral well used as anchor. Then, wire rope in receiving chamber is caught simultaneously from two wells adjacent with well provided with wire rope and equipped with hoist, and wire rope is fastened with anchors. Well equipment is completed in two wells adjacent to well into which wire rope is lowered. EFFECT: higher efficiency. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF MINERAL FORMATION | 1992 |
|
RU2039278C1 |
METHOD FOR HYDRAULIC BOREHOLE MINING | 1992 |
|
RU2033523C1 |
METHOD FOR HYDRAULIC BOREHOLE MINING OF MINERALS | 1992 |
|
RU2039279C1 |
METHOD FOR HYDRAULIC MINING OF MINERALS | 1992 |
|
RU2053365C1 |
METHOD FOR HYDRAULIC MINING OF MINERALS | 1992 |
|
RU2039276C1 |
METHOD FOR PREPARATION OF ORE BODY FOR MINING | 1992 |
|
RU2042821C1 |
METHOD FOR CLEANING BAYS AND COMPLEX OF EQUIPMENT FOR ITS REALIZATION | 1992 |
|
RU2037048C1 |
METHOD OF MINING MINERAL DEPOSITS AND SUPERSTRUCTURE FOR ITS EMBODIMENT | 1994 |
|
RU2078209C1 |
METHOD FOR EXPLORATION, TEST MINING AND EXPLOITATION OF MINERAL RESOURCES AND A SYSTEM TO IMPLEMENT THE SAME | 1994 |
|
RU2068960C1 |
METHOD FOR RECOVERY OF USEFUL COMPONENTS FROM WATER FORMATIONS THROUGH HOLES | 1990 |
|
RU2026490C1 |
Authors
Dates
1995-07-09—Published
1992-09-24—Filed