FIELD: well repair. SUBSTANCE: fluid is used for well killing, perforating and reperforating in well completion and workover. EFFECT: reduced interfacial tension at boundary with kerosene down to 4-6 mN/m; provided lower percentage of clay moistening less than 3% for 4 h; multiply reduced rate of metal corrosion as compared with salt solutions; preserved cement stone from cracking that is attained with the use of filtrate of technical pentaerythrite as killing fluid for well repair at temperature not below minus 15 C. 8 tbl
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CLEANING AND VIBRATION TREATMENT OF WELL WALLS | 1993 |
|
RU2049218C1 |
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1993 |
|
RU2042807C1 |
METHOD FOR TREATING OIL SEAM NEAR WELL BOTTOM BY ACID | 1993 |
|
RU2077667C1 |
COMPOSITION FOR TREATMENT OF HIGH-TEMPERATURE OIL WELLS | 1999 |
|
RU2204708C2 |
COMPOSITION FOR ACID TREATMENT OF NEARBY BOTTOM AREA OF A STRATUM IN DEVELOPMENT WELL | 1993 |
|
RU2061860C1 |
METHOD FOR TREATING OIL SEAM NEARBY WELL BOTTOM BY ACIDS | 1993 |
|
RU2077666C1 |
PROCESS OF SECONDARY OPENING OF PRODUCTIVE POOL AND GEAR FOR ITS IMPLEMENTATION | 1993 |
|
RU2057909C1 |
PROCESS LIQUID FOR PERFORATION AND STOPPING OF WELLS | 2020 |
|
RU2742167C1 |
LIQUID FOR WELL KILLING AND PERFORATION OPERATIONS | 2007 |
|
RU2333233C1 |
TECHNOLOGICAL LIQUID FOR PERFORATION AND SUPPRESSING OF WELLS | 1997 |
|
RU2115686C1 |
Authors
Dates
1995-08-27—Published
1993-04-23—Filed