FIELD: oil producing industry. SUBSTANCE: method for treatment of well perforated zone includes determination of type of argillaceous deposits in reservoir, stage injection into well of process solution, its holding and well completion. Process solution at the first stage is used in form of methanol in volume of 1.5-1.0 of pore volume of treated zone; at the second stage, process solution is used in form of aqueous of surfactant in volume 0.2-0.4 of pore space, and at the third stage. with presence in the reservoir of montmorillonite argillaceous deposits, process solution is used in form of sulfur oxygen-containing compounds or their mixture (5-12 mas.); surfactant (0.5-2 mas. ) and water; or in case of presence in reservoir of kaolinite argillaceous deposits, process solution is used in form of sodium and/or potassium, and/or ammonium bicarbonate, surfactant and water. EFFECT: increased permeability of formation zone due to removal of semisolid high-molecular deposits and argillaceous components. 3 cl
Title | Year | Author | Number |
---|---|---|---|
COMPOUND FOR OPENING PRODUCING FORMATION AND METHOD FOR TREATMENT WELL WITH THIS COMPOUND | 1992 |
|
RU2042804C1 |
METHOD FOR TREATMENT OF FORMATION | 1993 |
|
RU2053355C1 |
METHOD FOR TREATMENT OF WELL PERFORATED ZONE | 1992 |
|
RU2042801C1 |
METHOD FOR TREATMENT OF INJECTION WELL | 1992 |
|
RU2043492C1 |
METHOD FOR REMOVING SEDIMENTATIONS FROM INJECTION WELLS | 1995 |
|
RU2086760C1 |
SOLUTION FOR REMOVAL OF POLYMERIC MUD FILL | 1992 |
|
RU2042805C1 |
METHOD FOR REAGENT TREATMENT OF WELL | 1992 |
|
RU2042803C1 |
METHOD OF WELL REAGENT TREATMENT | 2000 |
|
RU2166626C1 |
METHOD FOR REMOVING SILT DEPOSITS FROM HYDROCARBON-CARRYING STRATA | 1994 |
|
RU2065036C1 |
METHOD FOR COLMATAGE OF WELL PERMEABLE FORMATION | 1993 |
|
RU2042787C1 |
Authors
Dates
1995-08-27—Published
1992-09-23—Filed