FIELD: mining industry. SUBSTANCE: method for treatment of well perforated zone includes injection into well of process solution, its holding in well, with subsequent removal of process solution and reaction products before arriving of formation fluid to well. Well perforated zone is treated in three stages: the first stage injection into well of process solution containing, mas. water 90.0-100.0; calcium dihydroorthophosphate 10.0-15.0; sulfur oxygen-containing compound 30.0-40.0; surfactant 0.15-0.25; the third stage injection into well of process solution containing, mas. water 90.0-100.0; sulfur oxygen-containing compound 30.0-40.0; surfactant 0.15-0.25. In so doing after injection of each process solution, additionally alternately injected and withdrawn is formation water in volume of 0.2-0.4 of pore volume of treated zone for 2-4 h. In this case, each process solution is held in well for 6-8 h. EFFECT: higher efficiency. 1 tbl
Title | Year | Author | Number |
---|---|---|---|
COMPOUND FOR OPENING PRODUCING FORMATION AND METHOD FOR TREATMENT WELL WITH THIS COMPOUND | 1992 |
|
RU2042804C1 |
METHOD FOR TREATMENT OF WELL PERFORATED ZONE | 1992 |
|
RU2042800C1 |
SOLUTION FOR REMOVAL OF POLYMER MUD FILL OF ACRYLIC SERIES | 1992 |
|
RU2042806C1 |
METHOD OF WELL REAGENT TREATMENT | 2000 |
|
RU2166626C1 |
METHOD FOR COLMATAGE OF WELL PERMEABLE FORMATION | 1993 |
|
RU2042787C1 |
SOLUTION FOR REMOVAL OF MUD FILL OF ACRYLIC POLYMERS | 1993 |
|
RU2042808C1 |
METHOD FOR REMOVING SEDIMENTATIONS FROM INJECTION WELLS | 1995 |
|
RU2086760C1 |
METHOD FOR REAGENT TREATMENT OF WELL | 1992 |
|
RU2042803C1 |
METHOD FOR REMOVING SILT DEPOSITS FROM HYDROCARBON-CARRYING STRATA | 1994 |
|
RU2065036C1 |
METHOD FOR TREATMENT OF INJECTION WELL | 1992 |
|
RU2043492C1 |
Authors
Dates
1995-08-27—Published
1992-06-15—Filed