FIELD: power engineering. SUBSTANCE: boiler plant uses boiler 1 and additional tubular air heater 2 with an independent air intake through air duct 8, main tubular air heater 3, electrostatic ash collector 4, device 5 for cleaning of flue gases from sulfur oxides, smoke exhauster 6 and smoke funnel 7 installed in succession in the boiler exit gas path. Exhaust air duct 9 of the air heater 2 through control valve 10 is connected to exhaust gas conduit between device 5 for cleaning of flue gases from sulfur oxides and smoke exhauster 6. Additional tubular air heater 2 can be made integral with the inlet (for gases) section of main tubular air heater 3. EFFECT: simplified design and reduced cost of boiler plant at simultaneous reduction of consumption of auxiliary power. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
BOILER PLANT | 1992 |
|
RU2056588C1 |
BOILER PLANT | 1992 |
|
RU2056587C1 |
BOILER PLANT | 0 |
|
SU1838726A3 |
BOILER PLANT | 0 |
|
SU1768861A1 |
METHOD FOR HEAT EXTRACTION FROM GAS-FIRED BOILER AND STEAM BOILER IMPLEMENTING IT | 1999 |
|
RU2159894C2 |
POWER UNIT OF THERMOELECTRIC PLANT | 0 |
|
SU1824510A1 |
BOILER PLANT | 0 |
|
SU1688049A2 |
STEAM POWER PLANT UNIT | 0 |
|
SU1776920A1 |
COMBINATION STEAM-GAS POWER PLANT AND METHOD OF ITS OPERATION | 1998 |
|
RU2124134C1 |
FLUE GAS HEAT UTILISATION DEVICE AND METHOD OF ITS OPERATION | 2010 |
|
RU2436011C1 |
Authors
Dates
1995-09-10—Published
1992-08-11—Filed