FIELD: mining industry. SUBSTANCE: mineral panel prepared for mining is cut off the massif. Base ledges sloping toward the panel are formed in the panel and massif above the undercutting level. A receiving working is done, and a flat bottom is made level with its roof sloping toward the roof. Slant wells are drilled in the lower part of the panel, and some dispersant solution is injected into the wells. The base ledges are destroyed layer by layer, and the panel weight is redistributed to its central part. As a result, the minerals become plastic and flowing, and they are forced into the working. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WORKING MINERAL DEPOSITS | 1992 |
|
RU2047768C1 |
DEPOSIT DEVELOPMENT METHOD | 1992 |
|
RU2047766C1 |
METHOD FOR WORKING STEEPLY DIPPING ORE BODIES | 1992 |
|
RU2047769C1 |
METHOD OF EXTRACTION OF MINERALS OF PILLARS | 2015 |
|
RU2610456C1 |
METHOD FOR STEEPLY DIPPING ORE BODY DEVELOPMENT | 2006 |
|
RU2319011C2 |
METHOD OF WORKING INCLINED ORE BODIES | 0 |
|
SU1803561A1 |
METHOD FOR DEVELOPMENT OF STEEP ORE BODIES | 1996 |
|
RU2117761C1 |
METHOD OF MINING DEPOSITS OF USEFUL MINERALS | 0 |
|
SU1149682A1 |
ORE BLOCK COMPLETION METHOD | 0 |
|
SU1765402A1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1263855A1 |
Authors
Dates
1995-11-10—Published
1992-12-08—Filed