FIELD: mining engineering. SUBSTANCE: method involves cutting of prepared mineral resources block from the surrounding rock. An inclined flat floor and a receiving working adjacent to it are built in the ground of the block. Supporting benches sloping towards the block are formed in the surrounding rock and above the stope drift in the block. Sloping wells are drilled in the lower part of the block and the dispersing fluid is pumped in. The supporting benches are destroyed layer-by-layer and the dispersed mineral resource body is forced out into the receiving working, where the useful components are selected, dispersing fluid is removed, tails are supplied to fill space over the sinking block and the dispersing fluid is transferred to be recovered and reused. EFFECT: enhanced effectiveness in mining mineral resources containing valuable crystals. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MINERALS DEPOSIT DEVELOPMENT METHOD | 1992 |
|
RU2047767C1 |
DEPOSIT DEVELOPMENT METHOD | 1992 |
|
RU2047766C1 |
METHOD FOR WORKING STEEPLY DIPPING ORE BODIES | 1992 |
|
RU2047769C1 |
METHOD OF WORKING INCLINED ORE BODIES | 0 |
|
SU1803561A1 |
METHOD FOR STEEPLY DIPPING ORE BODY DEVELOPMENT | 2006 |
|
RU2319011C2 |
METHOD OF EXTRACTION OF MINERALS OF PILLARS | 2015 |
|
RU2610456C1 |
METHOD FOR MINING PARALLEL CONTIGUOUS DEPOSITS | 0 |
|
SU1789688A1 |
ORE BLOCK COMPLETION METHOD | 0 |
|
SU1765402A1 |
METHOD OF MINING PARALLEL-CONTIGUOUS DEPOSITS | 0 |
|
SU1709094A1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1330315A1 |
Authors
Dates
1995-11-10—Published
1992-12-08—Filed