FIELD: construction. SUBSTANCE: method for formation chimney stack foundation includes formation of vertical openings for piles with depth less than design one, installation of piles in longitudinal rows and subsequent driving of piles to the design elevation. Vertical openings are made by auger drilling with diameters equal to, or less than, pile diameter. Drilling is effected by rows with interval not less than diameter of pile. In two-row arrangement of piles, drilling is started from any row, and in three- and more rows, drilling is started from middle rows. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING LOAD-BEARING CAPACITY OF GROUND AT DRIVING PILES | 1994 |
|
RU2102562C1 |
METHOD FOR FORMATION OF INCLINED WALL IN GROUND | 1997 |
|
RU2152478C1 |
METHOD FOR FORMING PROTECTIVE SCREEN | 1992 |
|
RU2070253C1 |
METHOD TO CONTROL CONSTRUCTION STRUCTURE QUALITY | 2009 |
|
RU2392620C1 |
METHOD OF ENGINEERING PROTECTION OF FLOATING PRODUCTION PLATFORM FROM ICE EFFECTS UNDER CONDITIONS OF ARCTIC SHELF | 2015 |
|
RU2604888C1 |
"KVASHA" PILE AND METHOD FOR DEEPENING IN SOIL | 1991 |
|
RU2047689C1 |
GUARDING CONSTRUCTIONS | 1992 |
|
RU2061139C1 |
METHOD TO TEST PILE IN SAGGING GROUND | 0 |
|
SU1719552A1 |
STRIKING CORE FOR DRIVING IN HOLLOW PILES | 0 |
|
SU1682470A1 |
METHOD FOR CONSTRUCTION OF CHAMBER-TYPE LARGE-SPAN UNDERGROUND WORKING | 1989 |
|
RU1802579C |
Authors
Dates
1995-12-10—Published
1992-11-23—Filed