FIELD: construction engineering. SUBSTANCE: according to method, at driving piles to required depth with subsequent final driving, used for determining load-bearing capacity of ground is measuring device connected with pile. Pile for this purpose is made up of two half-piles interconnected by link during driving. Pile is equipped with pressure sensors secured on one of half-piles at level of pile point and covered by side of other half-pile. After major driving cycle, connecting link is removed and pile is finally driven by 5-10 blows which caused cleaving of pile by ground core and transmission of pressure to sensors connected with graduated device. EFFECT: high efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMATION OF FOUNDATION OF CHIMNEY STACK | 1992 |
|
RU2049857C1 |
METHOD FOR FORMATION OF INCLINED WALL IN GROUND | 1997 |
|
RU2152478C1 |
FOUNDATION | 1997 |
|
RU2132427C1 |
METHOD FOR FORMING PROTECTIVE SCREEN | 1992 |
|
RU2070253C1 |
GUARDING CONSTRUCTIONS | 1992 |
|
RU2061139C1 |
METHOD FOR ENHANCING PILES FOUNDATIONS | 0 |
|
SU1645369A1 |
METHOD FOR CONTROL OF LOAD-CARRYING CAPACITY OF DRIVEN PILES | 1990 |
|
RU2049858C1 |
METHOD FOR INSTALLATION OF PILES INTO PERMAFROST GROUNDS | 1990 |
|
SU1828154A1 |
METHOD OF WALLING IN GROUND | 0 |
|
SU1827410A1 |
PRECAST PILE | 1991 |
|
RU2024682C1 |
Authors
Dates
1998-01-20—Published
1994-08-15—Filed