FIELD: hole drilling. SUBSTANCE: shock hydrodynamic waves of pressure are formed in hole clearance. Parameters of wave fields are measured by pressure transducers installed in hole clearance and are registered on oscillograph screen. By obtained shock diagrams time of trip by shock wave of distance between transducers and time of double trip of shock wave of distance from hole head to upper boundary of sticking zone are determined. Then depth of upper boundary of sticking zone is found by mathematical formula. EFFECT: increased authenticity of method. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINATION OF LOCATION AND INTENSITIES OF ABSORPTION ZONES | 1992 |
|
RU2057927C1 |
METHOD OF REDUCING PERMEABILITY OF FORMATIONS | 0 |
|
SU1601325A1 |
0 |
|
SU1670090A1 | |
ARRANGEMENT FOR DECLAYING AND MUD GROUTING OF WELL WALLS | 0 |
|
SU1218079A2 |
DEVICE FOR SEALING-OFF THIEF ZONES | 0 |
|
SU1789668A1 |
APPARATUS FOR DECLAYING AND MUD GROUTING OF WELLS | 0 |
|
SU1051236A1 |
DRILL BIT | 0 |
|
SU994672A1 |
HYDRAULIC MONITOR BIT | 0 |
|
SU1004601A1 |
METHOD FOR FREEING OF STUCK STRING | 1991 |
|
RU2017932C1 |
METHOD FOR LOCATING TRIP CEMENTING PLUG IN CASING STRING. | 2022 |
|
RU2805636C1 |
Authors
Dates
1996-04-10—Published
1992-04-29—Filed