FIELD: oil and gas industry.
SUBSTANCE: method for locating a trip cementing plug in a casing string. The method comprises the following steps: placing the trip cementing plug inside the casing string filled with the first fluid; pumping the displacement fluid after the trip cementing plug forcing the trip cementing plug through the interior of the casing, wherein at least one hydraulic fluid pump generates a harmonic acoustic signal in the form of pressure waves that travel down the casing and are reflected from the cementing plug; recording and transmitting pressure data to the pressure data collection system; mathematical processing of the pressure data to measure the double travel time of the harmonic acoustic signal reflected from the trip plug; determining the speed of propagation of the acoustic signal; determining the location of the trip cementing plug based on the measured double travel time and the speed of propagation of the acoustic signal. The trip cementing plug acts as a reflection boundary for the acoustic signal, and its movement changes the resonant frequencies of pressure fluctuations in the casing.
EFFECT: effective and accurate location of the trip cementing plugs inside the casing during the well cementing operation.
10 cl, 19 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL CEMENTING METHOD | 2022 |
|
RU2797167C1 |
METHOD OF WELLS CEMENTING | 2006 |
|
RU2330935C2 |
METHOD OF CEMENTING OF WELLS | 2006 |
|
RU2335618C2 |
CEMENTING METHOD OF WELL | 2020 |
|
RU2736429C1 |
CASING CEMENTING METHOD | 0 |
|
SU1737101A1 |
PROCESS OF PRESSURE GROUTING OF WELL | 2000 |
|
RU2183253C2 |
METHOD OF CASING CEMENTING | 0 |
|
SU1716098A1 |
METHOD FOR STEPWISE GROUTING OF WELLS | 0 |
|
SU926240A1 |
WELL STAGE CEMENTING METHOD | 2016 |
|
RU2615188C1 |
METHOD FOR CEMENTING OF LINER | 0 |
|
SU1624126A1 |
Authors
Dates
2023-10-23—Published
2022-12-15—Filed