FIELD: hydraulic structure building, in particular, filling tailing dump. SUBSTANCE: method for stacking tailings includes laying down main distributing pulp line with pulp outlets, pulp supply through pulp line from pump house, pulp separation into fractions comprising particles of various size, in so doing pulp including fractions of large size particles is separated at the beginning of pulp line, and they are precipitated at plots being the closest to pump house. Pulp comprising fractions of smaller size particles is transported to individual plots of tailing dump, where they are precipitated in order of decreasing sizes of solid particles. EFFECT: pulp transportation to remote plots with preset pump head, as well as decreased section of wearied pulp line. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF STORING WASTE OF CONCENTRATION PLANTS | 0 |
|
SU1020494A1 |
METHOD OF TAILING DUMP FORMATION | 2000 |
|
RU2162151C1 |
METHOD OF STORING MUCK | 0 |
|
SU1465480A1 |
METHOD OF ERECTING FILL-IN STRUCTURES | 0 |
|
SU812875A1 |
TAILING DUMP | 2024 |
|
RU2826742C1 |
TAILING DUMP | 2024 |
|
RU2828857C1 |
A METHOD OF STACKING CONCENTRATION TAILINGS | 0 |
|
SU1687745A1 |
COMPARTMENT OF SLUDGE POND FOR INDUSTRIAL ENTERPRISES WASTES, METHOD OF ITS DEVELOPMENT AND METHOD OF ITS PRESERVATION | 2009 |
|
RU2385987C1 |
METHOD OF CONSTRUCTING A DAM OF LOCALLY AVAILABLE MATERIALS | 0 |
|
SU866032A1 |
METHOD OF STORAGE OF MINERAL PROCESSING WASTE | 0 |
|
SU1645524A1 |
Authors
Dates
1996-05-27—Published
1993-08-02—Filed