FIELD: mining industry. SUBSTANCE: method includes formation of separating embankment whose crest carries laid pipeline for pulp discharge; building up of separating embankment by zenith washing up along longitudinal axis of tailing dump up to opposite guard embankment; changing over for two-side distribution pulp discharge due to which up to the moment of full filling with tailings, surface of dump acquires convex profile due to which in process of tailing dumping, technical stage of recultivation is executed, and capacity of tailing dump rises. EFFECT: higher reliability of guard embankments, increased dump capacity and execution of stage of its recultivation in process of its operation. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
RECULTIVATION METHOD OF COMPARTMENT OF INWASH STORAGE UNIT, WHICH IS FILLED WITH WASTES | 2009 |
|
RU2409743C1 |
METHOD OF JOINT CONSTRUCTION AND RESTORATION OF TAILING DUMPS | 2006 |
|
RU2335631C2 |
WASHED IN COLLECTOR OF WASTES ADJACENT TO SLOPE, METHOD FOR ITS MANUFACTURING AND METHOD OF ITS RECLAMATION | 2009 |
|
RU2398066C1 |
METHOD FOR RECLAMATION OF SLUDGE POND COMPARTMENT FILLED WITH GRAINY WASTES OF INDUSTRIAL ENTERPRISES | 2009 |
|
RU2396430C1 |
METHOD FOR RECULTIVATION OF INWASH TAILINGS POND ADJACENT TO SLOPE | 2009 |
|
RU2403389C1 |
COMPARTMENT OF SLUDGE POND FOR INDUSTRIAL ENTERPRISES WASTES, METHOD OF ITS DEVELOPMENT AND METHOD OF ITS PRESERVATION | 2009 |
|
RU2385987C1 |
PROCESS OF ERECTION OF ALLUVIAL MAN-MADE DEPOSIT | 2000 |
|
RU2186902C1 |
SINGLE-STAGE DIKE OF TAILING DUMP | 2001 |
|
RU2198258C2 |
METHOD OF DUMPING THE WASTE OF CONCENTRATION MILLS | 0 |
|
SU1451211A1 |
METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2009 |
|
RU2421568C1 |
Authors
Dates
2001-01-20—Published
2000-04-26—Filed