FIELD: well drilling. SUBSTANCE: washing agent is removed from beyond string and in-string cavities before supplying binding mixtures. In- string space is overlapped along all cross section in nearby bottom area. Then binding mixtures are supplied in beyond string cavity by portions with each subsequent portion supplied after solidification previous portion. Binding mixtures with fillers are supplied inside absorbing strata. During all the process when binding agents are supplied in- string space is periodically filled with fluid. EFFECT: higher reliability in well development. 7 dwg
Title | Year | Author | Number |
---|---|---|---|
PLUGGING SOLUTION WITH MINERALIZED LIQUID PHASE | 1995 |
|
RU2109923C1 |
METHOD FOR CEMENTING THE CONDUCTOR, A TECHNICAL COLUMN DURING THE CONSTRUCTION OF WELLS | 2022 |
|
RU2792128C1 |
METHOD FOR REVERSE CASING CEMENTING | 0 |
|
SU1749445A1 |
METHOD FOR REVERSE CEMENTING OF CASING IN WELL | 1994 |
|
RU2067158C1 |
SUBMERSIBLE DEVICE FOR ELIMINATION OF ABSORPTIONS | 0 |
|
SU1106895A1 |
METHOD FOR OIL AND GAS WELL CASING CEMENTING | 1989 |
|
RU2016188C1 |
WELL-CEMENTING APPARATUS | 0 |
|
SU907224A1 |
METHOD FOR WELL CASING IN FLOW ROCKS | 1993 |
|
RU2066735C1 |
METHOD OF CEMENTING OF WELLS WITH ABNORMALLY HIGH FORMATION PRESSURE | 1996 |
|
RU2100569C1 |
METHOD FOR ISOLATING LOST-CIRCULATION FORMATION IN WELLS | 0 |
|
SU1795081A1 |
Authors
Dates
1996-06-10—Published
1993-06-17—Filed