FIELD: oil and gas producing industry. SUBSTANCE: technical, economical and ecological deep well completion level is increased by improving the degree of substitution of drilling mud by plugging solution and by creation, during second section cementing, of a filtration preventing barrier of waste drilling mud in formations saturated by saline waters. EFFECT: increased efficiency of the process.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REVERSE CASING CEMENTING | 0 |
|
SU1749445A1 |
0 |
|
SU1778274A1 | |
METHOD OF CEMENTING CASINGS | 0 |
|
SU1615331A1 |
METHOD FOR REVERSE CEMENTING OF CASING IN WELL | 1994 |
|
RU2067158C1 |
METHOD FOR CEMENTING CASING STRINGS | 1993 |
|
RU2061840C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
METHOD FOR CEMENTING THE CONDUCTOR, A TECHNICAL COLUMN DURING THE CONSTRUCTION OF WELLS | 2022 |
|
RU2792128C1 |
METHOD OF CASING CEMENTING | 1996 |
|
RU2111342C1 |
PROCEDURE FOR WELL STABILISATION | 2010 |
|
RU2434120C1 |
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE | 2000 |
|
RU2188302C2 |
Authors
Dates
1994-07-15—Published
1989-03-30—Filed