FIELD: hydrodynamic methods of strata investigation. SUBSTANCE: deep-seated pressure gage is lowered to bottom filled with stratum fluid. The pressure gage is used to measure pressure along well shaft followed with calculation of medium fluid density. Then the well is open and fluid level is decreased. Volume of the extracted fluid is measured. Well is discharged and pressure restoration curve is recorded. On appearing fluid in well mouth the well is closed and recording is proceeded until investigation is over. Hydrodynamic parameters of the stratum is determined on the base of the data obtained. EFFECT: reliable data obtaining. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2417306C1 |
METHOD FOR DETERMINING OIL AND GAS WITHDRAWAL COEFFICIENT | 1994 |
|
RU2074317C1 |
METHOD FOR HYDRODYNAMIC TESTS OF EXPLOITATION WELL FORMATION (VERSIONS) | 2015 |
|
RU2598256C1 |
METHOD OF DETERMINING FORMATION PRESSURE IN OIL WELL | 1999 |
|
RU2167289C2 |
METHOD OF EXAMINING WELLS | 2003 |
|
RU2244105C1 |
METHOD OF DETERMINING EFFECTIVE POROSITY COEFFICIENT OF PRODUCING FORMATION | 0 |
|
SU1416681A1 |
FORMATION EVALUATION METHOD | 0 |
|
SU1789017A3 |
RESERVOIR CONDUCTIVITY DETERMINATION METHOD | 2006 |
|
RU2301886C1 |
METHOD FOR TREATMENT OF BOTTOMHOLE ZONE AND DEVELOPMENT OF WELLS AND JET INSTALLATION FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2822423C2 |
Authors
Dates
1996-06-10—Published
1993-04-07—Filed