FIELD: open-pit mining. SUBSTANCE: two stages are used to develop the deposit like this: with outer dumping at the first stage, and with inner dumping at the second stage. First stage quarry is excavated at deposit flank. In so doing constant side is formed at the butt of the quarry, and temporal non-working side is created with stationary transport communications. Then second stage quarry is developed with stripping rock dumped to inner dump at the plot adjacent to constant quarry side, and new transport communications created at the dump to provide exit from the quarry. Then additional developing of the quarry is carried out. EFFECT: reduced labor consumption. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPENCAST MINING OF INCLINED AND STEEPLY DIPPING DEPOSITS | 1992 |
|
RU2054549C1 |
METHOD FOR CLOSELY LOCATED ORE BODIES CUTTING WITH SEPARATE PITS | 2005 |
|
RU2294433C1 |
METHOD FOR OPEN EXTRACTION OF STEEP-FALLING DEPOSITS WITH INTERNAL DUMP-FORMING | 2002 |
|
RU2246620C2 |
METHOD OF MINERAL OPENCAST MINING | 0 |
|
SU1730452A1 |
METHOD OF OPEN MINING OF STEEP OBLONG DEPOSITS | 2011 |
|
RU2490462C2 |
METHOD OF OPENCAST MINING OF STEEP ELONGATED MINERAL DEPOSITS | 1999 |
|
RU2171377C2 |
PROCESS OF OPENCAST MINING OF STEEPLY DEEPING STRETCHED-OUT MINERAL DEPOSITS | 2002 |
|
RU2224109C2 |
METHOD OF OPENCAST MINING OF STEEPLY DIPPING STRETCHED DEPOSITS | 1999 |
|
RU2167297C2 |
METHOD FOR OPEN DEVELOPMENT OF STEEPLY-DIPPING DEPOSITS OF ROUND SHAPE WITH INTERNAL DUMPING | 2018 |
|
RU2685590C1 |
METHOD OF OPEN WORKING OUT OF STEEP DEPOSITS WITH INTERNAL SPOIL DISPOSAL | 2013 |
|
RU2528731C1 |
Authors
Dates
1996-08-10—Published
1992-09-07—Filed