FIELD: tank armament. SUBSTANCE: method involves inspection and replacement of detective connecting conductors and elements, replacement of supposed defective elements with serviceable ones and subsequent check of the stabilizer for proper functioning. The novelty of the method is the fact that stabilizer elements of a serviceable tank are used as serviceable elements without their removal from standard places, and their connection to the circuit of the stabilizer under check is accomplished by means of adapter connecting cables. If when switched on, the stabilizer functions, the elements under check are connected to its circuit, and their serviceability is determined according to variations of the serviceability indices. EFFECT: facilitated procedure.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FAULT FINDING IN TANK WEAPON STABILIZER | 1996 |
|
RU2101655C1 |
DEVICE FOR CHECK-UP OF AUTOMATIC LOADING MECHANISM | 1999 |
|
RU2155922C1 |
DEVICE FOR PROTECTION OF TANK GUN BARREL | 1997 |
|
RU2133430C1 |
METHOD TO REGULATE CYCLIC FUEL DELIVERIES BY FUEL INJECTION PUMP OF TANK DIESEL ENGINE IN THE FIELD | 1993 |
|
RU2076942C1 |
METHOD FOR FAULT-FINDING IN SPECIAL SYSTEMS OF TANKS AND INFANTRY COMBAT VEHICLES | 1999 |
|
RU2155315C1 |
METHOD FOR TRANSFER OF TANK GENERATORS TO WELDING OPERATIONS | 1999 |
|
RU2147362C1 |
DEVICE FOR TESTING GENERATORS AND REGULATOR RELAYS | 1999 |
|
RU2153180C1 |
METHOD OF PROVIDING UNIFORM CYCLIC DELIVERY OF DIESEL ENGINE FUEL INJECTION PUMP | 2001 |
|
RU2194186C1 |
MULTIPURPOSE LOAD-LIFTING DEVICE | 2000 |
|
RU2171754C1 |
GEAR TO REMOVE AND INSTALL UNITS OF TANK | 2000 |
|
RU2181673C2 |
Authors
Dates
1996-09-20—Published
1994-03-05—Filed