FIELD: pumping in horizontal wells. SUBSTANCE: critical zone is isolated above productive strata. The isolating is carried out prior to opening the productive strata. Filter-tail and development string are lowered into the well. filter-tail cavity is closed by lintel. filter-tail and development string are lowered individually. Filter-tail is lowered first. Profile pipes are lower together with the filter-tail. Upper part of the filter-tail is secured by the pipes. Development string first is lowered to the cavity of profile pipes. The pipes are lowered so to form a gap between lower end of the development string, walls of profile pipes and lintel. Then the development string achieves upper end of the filter- tail. This operation is carried out after pumping in mortar. Then they wait until the mortar gets hard. Then the lintel is broken. EFFECT: higher reliability. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FINISHING WELL | 1991 |
|
RU2061837C1 |
WELL COMPLETION METHOD | 1994 |
|
RU2083806C1 |
METHOD FOR COMPLETION OF WELL CONSTRUCTION | 0 |
|
SU1639120A1 |
WELL FILTER | 1994 |
|
RU2085708C1 |
METHOD FOR COMPLETION OF WELL | 0 |
|
SU1838589A3 |
DEVICE FOR STAGE CEMENTING OF WELL | 1992 |
|
RU2029066C1 |
METHOD FOR PUMPING IN HORIZONTAL WELLS | 1992 |
|
RU2061838C1 |
SHUTOFF FILTER | 1989 |
|
RU2041344C1 |
EQUIPMENT FOR COMBINED OF SEPARATE INJECTION OF FLUID INTO TWO FORMATIONS THROUGH ONE WELL | 1989 |
|
SU1753750A1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
Authors
Dates
1996-11-10—Published
1992-02-21—Filed