FIELD: oil production industry. SUBSTANCE: according to method, installed on production string before its lowering into well are upper and lower packing units which are located respectively above roof and below foot of productive reservoir. Installed above upper packing unit is cementation sleeve. Cementation of annular space is performed. For this purpose, hermetically sealed first is annular space under foot of productive reservoir. This is made by opening of lower packing unit. Then, similar operation is performed above roof of productive reservoir. Cement mortar is injected under pressure first under lower packing unit, then injection of cement mortar is performed through cementation sleeve. EFFECT: high efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR WELL COMPLETION | 1994 |
|
RU2091564C1 |
METHOD FOR CEMENTING FLOW STRING IN WELL | 0 |
|
SU1798483A1 |
DEVICE FOR FORMATIONS SEGREGATION | 2000 |
|
RU2182958C2 |
RESERVOIR SELECTIVE SEALING METHOD AT WELL CASING STRING FIRST STAGE CEMENTING | 2008 |
|
RU2379475C1 |
DEVICE FOR INVESTIGATION AND OPERATION OF WELL DRILLED INTO RESERVOIR MADE UP OF TWO INTERLAYERS | 1994 |
|
RU2084625C1 |
METHOD FOR STEPPED CEMENTATION OF WELL IN HIGHLY PENETRABLE GAS-SATURATED COLLECTORS | 2003 |
|
RU2241819C1 |
DEVICE FOR STAGE CEMENTING OF WELL | 1992 |
|
RU2029066C1 |
CEMENTING METHOD OF WELL | 2020 |
|
RU2728170C1 |
WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 |
|
RU2775319C1 |
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE | 2000 |
|
RU2188302C2 |
Authors
Dates
1997-08-20—Published
1993-06-22—Filed