FIELD: oil production. SUBSTANCE: diaphragm is installed in production tubing. Fluid level is increased in drill string- borehole annulus until diaphragm is ruptured. Compressed gas under pressure is used to force back the fluid. Then pressure is increased inside the production tubing and the diaphragm is ruptured. Then pressure is decreased suddenly in the drill string-borehole annulus. Besides, additional diaphragm is installed in production tubing below the main one. The cavity between the diaphragms is sealed. Additional diaphragm is calculated to rupture by hydraulic hammer. EFFECT: higher efficiency. 2 cl, 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ACTION UPON BOTTOM-HOLE ZONE OF POOL | 1992 |
|
RU2081307C1 |
DEVICE FOR IMPACT ACTION UPON OIL BED | 1996 |
|
RU2106471C1 |
METHOD OF REOPENING PRODUCTIVE FORMATION | 1996 |
|
RU2136873C1 |
TREATMENT METHOD OF BOREHOLE ZONE OF LOW-PERMEABLE BED AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703093C2 |
METHOD OF INCREASE OF WELL PRODUCTIVITY | 1994 |
|
RU2079644C1 |
WELL COMPLETION METHOD | 1998 |
|
RU2127805C1 |
METHOD TO ACT ON WELL CRITICAL ZONE | 1992 |
|
RU2068494C1 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
PROCESS OF HYDRAULIC FRACTURING OF FORMATIONS IN WELLS | 2000 |
|
RU2219335C2 |
METHOD FOR REMOVING SAND-CLAY PLUG IN WELL AND ITS DEVELOPMENT UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2013 |
|
RU2544944C2 |
Authors
Dates
1997-01-20—Published
1994-01-31—Filed