FIELD: oil and gas industry.
SUBSTANCE: hydraulic hammer is installed on the lower end of a flexible pipe and lowered to a well to a location place of a sand-clay plug. A coiled tubing unit is located on the well head. A bench of foam-forming liquid (FFL) of design length is formed in an axial duct of the flexible pipe. Mechanical action on the sand plug surface is performed by the hydraulic hammer at its movement and pumping through it of FFL benches with further generation of foam in inter-pipe space in each bench by bubbling through it of a bench of gas supplied from the axial duct of the flexible pipe through the hammer. After the plug is removed, development of the well is performed by continuous supply of gas to the axial duct of a flexible string of pipes and by invoking an influx at reduction of pressure below the formation one.
EFFECT: improving efficiency of removal of a sand-clay plug and development of a well.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SAND PLUG WASHING UP AND PREVENTION OF SAND ADDITION IN WATERING WELL | 2007 |
|
RU2342518C1 |
METHOD OF WASHING OF SAND PLUG AND PREVENTION OF ADDITION OF SAND IN WATER PRODUCER UNDER CONDITIONS OF LIFTING OF GAS-WATER CONTACT | 2007 |
|
RU2341645C1 |
METHOD OF WASHING OVER SAND PLUG IN GAS WELL UNDER CONDITIONS OF LOW RESERVOIR PRESSURE | 2007 |
|
RU2341644C1 |
FLUSHING METHOD OF SAND PLUG IN GAS WELL IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2010 |
|
RU2445446C1 |
DEVELOPMENT METHOD OF GAS WELL WITH PACKER IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2009 |
|
RU2399757C1 |
WELL OPERATION METHOD | 2017 |
|
RU2658854C1 |
METHOD FOR WELL CLEANING FROM PROPPANT PLUG | 2006 |
|
RU2373378C2 |
HYDROPERCUSSION DEVICE | 2014 |
|
RU2586122C2 |
DEVELOPMENT METHOD OF GAS WELL UNDER CONDITIONS OF ABNORMALLY LOW PRESSURE OF FORMATION (VERSIONS) | 2011 |
|
RU2455477C1 |
PUMP-VACUUM DEVICE FOR WELL CLEANING OF SAND PLUG | 2006 |
|
RU2314411C1 |
Authors
Dates
2015-03-20—Published
2013-02-26—Filed