FIELD: mining. SUBSTANCE: method includes well drilling, interconnection of the drilled wells, firing the seam, converting fuel into gas to produce generator gas and grouting the caved in rocks of the worked out strata by supplying backfill material along the wells. Wells for supplying backfill material are drilled with branched or single horizontal portion placed directly in rock roof above its horizontal axis. Backfill material is supplied using compressed air to fill the worked out space in caving in rock roof spaced from the fire face. EFFECT: higher efficiency. 11 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INCREASING STABILITY OF ROOF ROCK | 1992 |
|
RU2065038C1 |
METHOD OF COMPREHENSIVE DEVELOPMENT BROWN COAL DEPOSITS | 2013 |
|
RU2526953C1 |
IN-SITU COAL SERIES GASIFICATION METHOD | 2007 |
|
RU2345216C2 |
METHOD FOR UNDERGROUND GASIFICATION OF GAS-BEARING COAL SERIES | 2006 |
|
RU2319838C1 |
UNDERGROUND COAL GASIFICATION TECHNIQUE | 2010 |
|
RU2441980C2 |
COMPLEX DEVELOPMENT METHOD OF UNDERGROUND COAL FORMATION THROUGH WELLS | 2013 |
|
RU2539517C2 |
METHOD FOR UNDERGROUND COAL SEAM SERIES GASIFICATION | 2006 |
|
RU2307244C1 |
METHOD FOR DEVELOPMENT OF STRATA DEPOSITS OF MINERALS | 1996 |
|
RU2102592C1 |
METHOD OF UNDERGROUND GASIFICATION OF COAL | 2022 |
|
RU2797421C1 |
METHOD FOR FILLING OF MINED-OUT SPACE DURING DEVELOPMENT OF GENTLY SLOPING BEDS WITH LONG PILLARS | 2020 |
|
RU2735173C1 |
Authors
Dates
1997-01-20—Published
1992-06-22—Filed