FIELD: mining industry. SUBSTANCE: method can be used in mining inclined ore bodies primarily of medium thickness. Filling mass is compiled in the form of guarding ore pillars which are created at contact between pillar and worked-out area of chamber and for this purpose drilled raises intended for cutting chamber reserves extend through underneath rock mass below floor of worked-out area. Ore is mined with retention of underneath rock above drilled raise, and formation of guarding pillars is effected by blasting underlying above drilled raise, delivering it by blasting method to side walls of chambers and plugging by delivery of binding compound through blast-holes intended for cutting reserves of ore pillar which were drilled up to crossing side walls of adjacent chambers. EFFECT: high efficiency. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF INCLINED ORE BODIES | 1994 |
|
RU2069755C1 |
METHOD FOR MINING INCLINED ORE BODIES | 1994 |
|
RU2081319C1 |
METHOD FOR MINING INCLINED ORE BODIES | 1996 |
|
RU2116448C1 |
METHOD FOR MINING INCLINED ORE BODIES | 1995 |
|
RU2116446C1 |
METHOD FOR MINING ORE BODIES | 1996 |
|
RU2116449C1 |
METHOD FOR MINING OF INCLINED ORE BODIES | 1994 |
|
RU2069756C1 |
DEVELOPMENT METHOD OF ORE BODIES | 2008 |
|
RU2365754C1 |
ORE BODY MINING METHOD | 2009 |
|
RU2424432C1 |
PROCESS OF DEVELOPMENT OF COMPLEX-STRUCTURED DEPOSITS | 2002 |
|
RU2223401C2 |
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 1999 |
|
RU2167296C1 |
Authors
Dates
1997-06-10—Published
1994-04-28—Filed