FIELD: construction of oil and gas wells. SUBSTANCE: method can be used in cementation of casing string at presence of beds absorbing drilling liquids and plugging solutions. According to method, subject to cementation is lower part of casing string down to absorbing zone. Cementation is effected by cement slurry. In wells with catastrophic absorption, cementation of upper part of casing string is effected by dry, powder-like plugging cement which is delivered as needed by means of compressed air. Simultaneously with delivery of plugging material, transmitted to casing string are oscillations with frequency of 2-5 Hz. EFFECT: improved quality of casing string cementation due to producing continuous cement stone in hole clearance up to hole head, high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CEMENTING CASINGS OF DEEP WELLS | 0 |
|
SU1303702A1 |
WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 |
|
RU2775319C1 |
METHOD OF ISOLATING ABSORBING AND WATER-SATURATED FORMATIONS | 0 |
|
SU1240868A1 |
METHOD OF ISOLATING OIL-, WATER AND GAS-BEARING FORMATIONS IN PRODUCING WELL | 0 |
|
SU1406338A1 |
DEVICE FOR ISOLATION OF DRILLING FLUID ABSORPTION ZONES IN WELL | 1995 |
|
RU2106474C1 |
METHOD OF STEPWISE CEMENTING OF WELLS | 0 |
|
SU829876A1 |
METHOD OF CEMENTING CASING STRING | 2015 |
|
RU2605856C1 |
METHOD FOR OIL AND GAS WELL CASING CEMENTING | 1989 |
|
RU2016188C1 |
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE | 2000 |
|
RU2188302C2 |
WEDGE-TYPE CEMENTED WHIPSTOCK | 1997 |
|
RU2119573C1 |
Authors
Dates
1997-07-10—Published
1995-07-13—Filed