FIELD: industrial electric power supply. SUBSTANCE: method involves 3-4 preliminary measurements of average electric load during given intervals for each type of electric power user in each operation mode, and measurement of duration of each operation mode for 3-4 base periods. These data are used for calculation of mean values and square variance of specific loads and duration of operation modes and for detection of required number of additional measurements according to precision of given task. Then estimation of each separate load and its duration is calculated and modeled using computer according to normal distribution function for each electric power user and for each mode of its operations. Group load is calculated using mathematical model methods. EFFECT: increased precision. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING ELECTRIC LOAD OF ELECTRIC UNIT GROUP | 0 |
|
SU1307362A1 |
METHOD OF DETERMINING MAXIMUM ELECTRIC LOAD OF SIMILAR TYPE INSTALLATIONS | 0 |
|
SU796765A1 |
ELECTRIC-ARC STEEL MELTING FURNACE DUTY CONTROL SYSTEM | 1991 |
|
RU2066939C1 |
METHOD FOR CONTROL OF GROUP OF PULSE CONVERTERS | 1983 |
|
SU1284443A1 |
METHOD OF AUTOMATICALLY CONTROLLED EXAMINATION OF ELECTRIC LOAD PARAMETERS | 1992 |
|
RU2092859C1 |
MEASUREMENT SYSTEM FOR CONDUCTING GEOEXPLORATION | 2010 |
|
RU2436132C1 |
METHOD TO CONTROL ONE OR SEVERAL POWER GENERATOR PLANTS | 2011 |
|
RU2479908C1 |
METHOD FOR ANALYZING THE QUALITY OF ELECTRICAL ENERGY IN A THREE-PHASE ELECTRICAL NETWORK | 2021 |
|
RU2763121C1 |
0 |
|
SU1780022A1 | |
ELECTRIC ENERGY STORAGE CONTROL SYSTEM FOR EXPANSION OF RANGE OF PERMISSIBLE MODES OF GENERATING INSTALLATIONS OF DISTRIBUTED GENERATION SOURCES AT SHORT-TERM FREQUENCY DEVIATIONS | 2019 |
|
RU2718113C1 |
Authors
Dates
1997-07-27—Published
1994-06-10—Filed