FIELD: oil production industry. SUBSTANCE: method implies injection of chemical reagents into productive bed through well, increase of bed pressure due to liberation of carbon dioxide in result of reaction, and taking of product through same well. Drilled through vertical well over productive bed is at least one horizontal hole having curvilinear positioning in plan. Calculated volume of reagents is injected periodically with time delay for pressure stabilization without taking product between periods until bed pressure increases up to initial value. Subsequent taking of product is effected up to economically profitable level is retained. Cycles are repeated. EFFECT: high efficiency. 1 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DISPLACING OIL FROM LENS | 1993 |
|
RU2065942C1 |
METHOD FOR EXPLORATION OF MULTI-SEAM OIL DEPOSIT WITH RESERVOIRS OF DIFFERENT STRUCTURE TYPE | 1993 |
|
RU2072031C1 |
METHOD OF DEVELOPMENT OF OIL POOL HAVING RESERVOIR PITCHING-OUT ZONES | 1994 |
|
RU2090743C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS NONUNIFORM ABOUT RESERVOIR PROPERTIES IN DIFFERENT ZONES | 1993 |
|
RU2046181C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATIONS OF DIFFERENT PERMEABILITY SEPARATED BY IMPERVIOUS ROCKS | 1990 |
|
SU1820657A1 |
METHOD FOR DEVELOPMENT OF OIL MULTILAYER FIELD | 1989 |
|
RU1653403C |
METHOD OF DEVELOPING HIGH-VISCOSITY OIL OR BITUMEN | 1983 |
|
SU1129986A1 |
METHOD FOR DEVELOPING OIL DEPOSITING CARBONATE COLLECTORS OF FISSURE-CAVITY TYPE | 1992 |
|
RU2073791C1 |
METHOD FOR FLOODING OIL DEPOSIT | 1994 |
|
RU2072032C1 |
METHOD OF DEVELOPING HIGH-VISCOSITY OIL | 1982 |
|
SU1078976A1 |
Authors
Dates
1997-08-10—Published
1995-01-17—Filed