FIELD: prospecting of technogenic mineral deposits. SUBSTANCE: the offered method includes noncore hole drilling by intervals with drillings brought to the surface using wet pneumatic flushing of hole bottom. Drillings brought to the surface are conveyed by air flow from the hole mouth to pile them in form of truncated cone. Before taking sample of drillings from each interval of hole, drilling is stopped. After taking samples, drillings from hole mouth are removed. EFFECT: higher efficiency of the method due to increased confidence and representation of taken samples. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TAKING SLURRY SAMPLE WHILE DRILLING AT FULL HOLE BOTTOM | 0 |
|
SU994705A1 |
METHOD OF MINERAL LEACHING FROM PRODUCING HORIZONS | 1999 |
|
RU2162148C1 |
METHOD FOR FIELD INVESTIGATIONS OF ORE GEOTECHNOLOGICAL PROPERTIES | 1990 |
|
RU2066747C1 |
RADIOACTIVE WASTE BURIAL METHOD | 1994 |
|
RU2063077C1 |
METHOD TO LOCALIZE IMPURITIES IN WATER-BEARING HORIZONS | 1992 |
|
RU2039230C1 |
METHOD FOR MINERAL MINING FROM PIPELINE OREBODY | 1993 |
|
RU2034149C1 |
METHOD OF WASTE STORAGE | 1995 |
|
RU2087393C1 |
METHOD FOR UNDERGROUND ISOLATION OF RADIOACTIVE WASTES | 1999 |
|
RU2160476C1 |
METHOD FOR SINGLE-HOLE UNDERGROUND LEACHING OF ORE BODIES | 1994 |
|
RU2069262C1 |
METHOD FOR UNDERGROUND LEACHING OF ROCKY ORES IN PLACES OF THEIR OCCURRENCE | 1993 |
|
RU2067169C1 |
Authors
Dates
1997-09-10—Published
1991-06-17—Filed