METHOD OF MOUNTING OF TOWER AND MAST STRUCTURES BY MEANS OF CRANK MECHANISM Russian patent published in 1997 - IPC

Abstract RU 2091549 C1

FIELD: mounting of building structures; methods of mounting of tower and mast structures by building-up with large space sections by means of crank mechanism. SUBSTANCE: two tackle blocks 5 with one common rope are secured from outer sides to lower part of structure 4 mounted by one of traditional methods (by crane or mast). Enlarged on ground surface is rigid block consisting of several space sections C1, C2, C3, C4 which are rigidly connected to one another by one face with two flat hinges 6, and by the opposite face, with temporary bolts. Block is lifted in vertical position by means of tackle blocks and guy, and its upper end is secured to upper part of structure 4 mounted before by means of two hinges 7. Lower movable roller of tackle blocks 5 are connected with bottom of hanging vertical blocks. Temporary bolts are removed between two upper sections C1 and C2 with hinges 6 remaining intact. Block is turned in this way into crank mechanism in which upper block C1 is crank and rigid block consisting of sections C2, C3, C4 serves as connecting rod. After switching-on electric hoist of tackle blocks 5 for lifting bottom of section C4 (slider) slides over temporary guides 10 to rise, and section C1 - crank, after turning through 180 deg and fastening, assumes design position, connecting rod hangs on hinges 6, and after removal of temporary bolts between two upper sections of connecting rod turns into a new crank mechanism in initial position for starting next cycle. In this way, all sections of initially suspended block (C1, C2, C3) is successively turned into crank, then, in stem of structure. In this case, the last section (C4) is mounted with the help of false section 8 used as the last connecting rod. Sections of block in mounting are transformed into stem of structure due to the fact that enlarged block consists of sections interconnected for time of mounting by one face with hinges 6. EFFECT: higher efficiency. 3 dwg

Similar patents RU2091549C1

Title Year Author Number
CRANELESS METHOD FOR MOUNTING AND DISMOUNTING DRILLING DERRICKS, MAST AND TOWER CONSTRUCTIONS WITH ENLARGED SECTIONS 2002
  • Magafurov D.B.
RU2232863C2
LOAD-LIFTING CRANE 1993
  • Peremyslovskij V.I.
  • Zemshchinin O.N.
  • Proskurjakov N.S.
  • Suvorkin V.N.
RU2063375C1
TOWER CRANE 2006
  • Bogdanov Anatolij Viktorovich
  • Postnikov Evgenij Stepanovich
RU2307783C1
ARRANGEMENT FOR MOUNTING TOP SECTIONS OF VERTICAL STRUCTURES 0
  • Tsyganok Aleksandr Ivanovich
SU1330291A1
METHOD OF INSTALLING MOUNTED EQUIPMENT OF BERKUT DRILL-PILE DRIVER 2001
  • Zlygostev N.K.
  • Putilin V.P.
  • Sosnovskikh V.A.
  • Svakhin A.K.
RU2196203C1
0
  • Basyro P.A.
  • Izotov L.G.
  • Tejtelbaum L.A.
SU100342A1
ARMORED REPAIR-EVACUATION VEHICLE 1996
  • Komarov A.V.
  • Necheukhin S.L.
RU2134398C1
TOWER CRANE AND METHOD FOR ITS ASSEMBLY 2008
  • Marysaev Boris Kleonikovich
RU2371374C1
ASSEMBLY SUPPORT FOR SELF-ERECTING CRANE 1990
  • Saplin V.S.
  • Shchevelev Ju.S.
RU2022908C1
TOWER CRANE 2011
  • Marysaev Boris Kleonikovich
RU2492132C2

RU 2 091 549 C1

Authors

Magafurov D.B.

Dates

1997-09-27Published

1995-02-09Filed