FIELD: oil and gas production industry. SUBSTANCE: increased final oil recovery from hydrocarbon deposit and reduced time for its development are achieved by method implying vibro-seismic treatment at step-by-step increasing in time of amplitude and/or vibration frequency. Amplitude and frequency of vibration are determined according to special formula. Vibro-seismic treatment is effected at increasing in time of vibration amplitude and reducing in time of vibration frequency. At vibro-seismic treatment, wave is formed in bed with front configuration corresponding to form of deposit. Radiation intensity is increased according to reduced permeability of interlayers, and is reduced according to increased permeability of interlayers. Spreading of wave front is directed in parallel to stratification. EFFECT: high efficiency. 4 cl, 5 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WORKING OIL DEPOSIT WITH VARIOUS PERMEABILITY OF CLAY-CONTAINING COLLECTORS | 1992 |
|
RU2074956C1 |
PROCESS OF EXPLOITATION OF FLOODED OIL DEPOSITS | 1992 |
|
RU2057906C1 |
METHOD OF DEVELOPING FLOODED OILFIELD | 0 |
|
SU1596081A1 |
PROCESS OF EXPLOITATION OF FLOODED OIL FIELD AND GEAR FOR ITS IMPLEMENTATION | 1999 |
|
RU2163660C1 |
METHOD FOR SEISMICALLY INFLUENCING PRODUCTIVE FORMATION | 2005 |
|
RU2291956C2 |
HYDROCARBON RESERVOIR DEVELOPMENT METHOD | 2004 |
|
RU2261985C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1998 |
|
RU2146328C1 |
METHOD FOR DEVELOPMENT OF NON-UNIFORM FORMATIONS | 2015 |
|
RU2607127C1 |
METHOD OF HYDROCARBON POOL DEVELOPMENT | 2002 |
|
RU2191891C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1998 |
|
RU2144614C1 |
Authors
Dates
1997-11-10—Published
1995-07-05—Filed