FIELD: oil production industry. SUBSTANCE: according to method, injected into well is solution of acid and solution of surface-active matter in which used are solutions on accompanying brine water. Before injection of acid solution, bottom-hole of well is filled with 3-15% solution of muriatic acid on accompanying brine water. Technological delay is undertaken until level of muriatic acid is reduced. Level of filling bottom-hole is raised by new portion of muriatic acid solution. Operations of reducing-raising level are repeated. Injected into down-hole zone are acid solution and solution of surface-active matter until well injectivity reaches at least 70% of injectivity of closest injection wells. Injection of solutions is performed in mode of their continuous motion in down-hole zone of well. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATMENT OF WATERED DOWN-HOLE ZONE OF PRODUCING WELL | 1996 |
|
RU2094603C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF INJECTION WELL | 1995 |
|
RU2084621C1 |
METHOD FOR DEVELOPMENT OF OIL POOL | 1995 |
|
RU2084617C1 |
METHOD FOR RAISING OUTPUT OF OIL BED IN MULTIPLE-BED DEPOSIT | 1998 |
|
RU2144615C1 |
METHOD FOR DEVELOPMENT OF MULTIPLE-BED OIL POOL | 1996 |
|
RU2084620C1 |
METHOD OF ACTION ON FACE ZONE OF OIL POOL OR ON OIL POOL | 1997 |
|
RU2120030C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM STRATA OIL DEPOSIT | 1996 |
|
RU2096595C1 |
METHOD FOR INCREASING OIL RECOVERY OF HIGH-VISCOSITY OIL OF CARBONATE RESERVOIR | 2024 |
|
RU2824108C1 |
METHOD OF OIL POOL DEVELOPMENT | 2000 |
|
RU2156352C1 |
COMPOSITION FOR ACID TREATMENT OF BOTTOM HOLE ZONE OF INJECTION AND PRODUCING WELLS | 1996 |
|
RU2109937C1 |
Authors
Dates
1997-11-10—Published
1996-07-05—Filed