FIELD: oil production industry. SUBSTANCE: hydrocarbon solution of surface- active substance of 2.0-30.0% concentration is prepared and is pumped into well. Leak-tightness of operational string and well response are determined in advance. After pumping of hydrocarbon solution of surface-active substance into well it is advanced into well by mineralized water with density not less than 1040.0 kg/cu.m pumped into well. EFFECT: increased efficiency of action on face zone of oil pool and enhanced oil recovery from pool. 2 tbl
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD FOR PROCESSING FACE ZONE OF OIL POOL | 2005 | 
 | RU2291959C1 | 
| OIL DEPOSIT EXTRACTION METHOD | 2002 | 
 | RU2224880C1 | 
| METHOD OF SIMULATION OF OIL FORMATION BOTTOM-HOLE ZONE OR OIL FORMATION | 2012 | 
 | RU2569882C1 | 
| METHOD FOR NON-UNIFORM OIL POOL DEVELOPMENT CONTROL | 2005 | 
 | RU2279540C1 | 
| METHOD FOR DEVELOPING AN OIL RESERVOIR THAT IS HETEROGENEOUS IN TERMS OF PERMEABILITY | 2022 | 
 | RU2778501C1 | 
| METHOD FOR RAISING OUTPUT OF OIL BED IN MULTIPLE-BED DEPOSIT | 1998 | 
 | RU2144615C1 | 
| METHOD OF SELECTIVE RESTRICTION INFLOWS IN DEVELOPMENT WELLS | 2000 | 
 | RU2184836C2 | 
| METHOD FOR DEVELOPMENT OF OIL RESERVOIR HETEROGENEOUS IN PERMEABILITY | 2020 | 
 | RU2748198C1 | 
| METHOD FOR LIMITING WATER INFLOW IN PRODUCTION WELL | 2021 | 
 | RU2754171C1 | 
| REAGENT FOR TREATMENT OF BOTTOMHOLE OIL FORMATION ZONE AND A PROCESS OF TREATING BOTTOMHOLE OIL FORMATION ZONE | 2006 | 
 | RU2319726C1 | 
Authors
Dates
1998-10-10—Published
1997-10-17—Filed