FIELD: oil and gas industry. SUBSTANCE: this relates to bed liquid sampling at drilling oil and gas wells, at testing operations with using tube-type bed testers. Installed between multiple-cycle bed tester and its equalizing valve interlocked with shut-off valve are drill pipes having threaded seat and locking needle. After raising to surface, locking needle is unscrewed and gas is released with taking its samples. After pressure is fully released, sampler (drill pipes) is unloaded prior to opening of shut-off valve from underneath. Outflowing liquid is then sampled (if necessary). Use of sampler allows for taking samples considerable in their volume. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SUSPENDED TUBULAR FORMATION TESTER FOR EXAMINING OIL AND GAS WELLS DURING DRILLING PROCESS | 1995 |
|
RU2097555C1 |
SAMPLER FOR PACKER | 1994 |
|
RU2082002C1 |
ANCHOR PACKER | 1995 |
|
RU2088743C1 |
SAMPLE-TAKING DEVICE FOR FORMATION TESTER | 0 |
|
SU829903A1 |
0 |
|
SU380828A1 | |
SAMPLER FOR FORMATION TESTER | 0 |
|
SU907229A1 |
SAMPLER FOR FORMATION TESTER | 0 |
|
SU735757A1 |
GEAR FOR TESTING SEAMS | 0 |
|
SU1804553A3 |
METHOD OF TESTING WELLS AND RESERVOIR SURVEY IN PROCESS OF BORING AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2366813C1 |
SAMPLER - FORMATION TESTER | 0 |
|
SU1786251A1 |
Authors
Dates
1997-11-10—Published
1994-09-28—Filed