FIELD: transportation of gas over main pipe-lines, putting into service sections of pipe-lines. SUBSTANCE: process includes filling of section of pipe-line by tapping from source to pressure equal to pressure in source with its subsequent rise up to specified value by pumping of medium with pumping means, maintenance of this pressure and release. Rise of pressure is performed by gas by formation of medium in the form of gas-and-liquid mixture. After pressure test gas is separated from liquid and is fed into tested section and liquid is used again for preparation of gas-and-liquid mixture. Functioning main pipe-lines or pressure pipe-lines of gas fields can be used as source of gas. Piston pump may be used in the capacity of pumping means. In this case formed gas-and-liquid medium should contain not less than five volumetric per cent of liquid phase under pressure equal to feed of gas into pumping means. EFFECT: enhanced reliability and efficiency of process.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TESTING MAIN GAS PIPELINES | 2002 |
|
RU2227907C1 |
MODE OF DRAINAGE OF CAVITIES OF PIPELINES AND AN ARRANGEMENT FOR ITS EXECUTION | 2004 |
|
RU2272974C2 |
METHOD OF TAKING SAMPLES OF GAS-LIQUID FLOW AND DEVICE FOR ITS EMBODIMENT | 1995 |
|
RU2091579C1 |
METHOD FOR CLEANING EARTH OF PORT HYDRAULIC STRUCTURES FROM PETROLEUM PRODUCTS | 1998 |
|
RU2137881C1 |
SPORTIVE LAWN HEATING APPARATUS | 1997 |
|
RU2118080C1 |
DEVICE FOR PRODUCTION OF HYDROGEN AND OXYGEN | 1993 |
|
RU2038422C1 |
GAS-LIQUID REACTOR | 1996 |
|
RU2095134C1 |
DEVICE FOR PRESSING SEALING PASTE INTO PIPELINE FITTINGS | 1997 |
|
RU2119605C1 |
COMPOSITION FOR TEMPORARILY SEALING OIL PIPELINE SHUT-OFF VALVES | 1996 |
|
RU2117684C1 |
PLANT FOR PNEUMATIC TESTS OF PIPELINE AND METHOD OF PNEUMATIC TESTS OF PIPELINE (VERSIONS) | 2008 |
|
RU2380609C1 |
Authors
Dates
1997-11-10—Published
1995-05-29—Filed