FIELD: oil and gas production. SUBSTANCE: when being reconditioned, oil, gas or injection well is filled with killing fluid to prevent formation liquid and gas blowout. In the well, packer with back valve is preliminarily installed above formation and killing fluid is pumped in over the packer to form fluid column providing excessive pressure as compared to pressure below the packer. Then depressurization of well is effected, downhole equipment is fulfilled, well is sealed and started up after killing fluid is preliminarily removed. EFFECT: enhanced reliability of operation. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROCESS WELL TREATMENT | 2015 |
|
RU2600137C1 |
METHOD OF ACTION ON PRE-BOTTOM ZONE OF WELL IN HYDROCARBON FIELD WITH BOTTOM WATER AND RECOVERY OF OIL AND WATER BY PUMPS-COMPRESSORS WITH SEPARATE INTAKE FOR CONELESS OPERATION OF WELL | 2005 |
|
RU2293214C2 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
METHOD FOR CREATION OF GRAVEL FILTER IN WELL | 1999 |
|
RU2146759C1 |
DEVICE FOR RESTORATION OF PRODUCTIVITY OF PRODUCING WELLS AND INJECTIVITY OF INJECTION WELLS | 2000 |
|
RU2184837C1 |
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
TREATMENT METHOD OF BOTTOM-HOLE FORMATION ZONE, AND DOWNHOLE SYSTEM FOR ITS IMPLEMENTATION | 2011 |
|
RU2485299C1 |
METHOD FOR THERMOCHEMICAL TREATMENT OF AN OIL RESERVOIR | 2021 |
|
RU2783030C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
Authors
Dates
1997-11-27—Published
1995-05-31—Filed