FIELD: burial of soda production wastes in mines formed by solving of salt beds through drill wells. SUBSTANCE: method comes to burial of wastes in form of sludge suspension with density exceeding density of forced out brine. Wastes are delivered into chamber through one tube string, and brine is extracted through other tube string. Novelty is that sludge suspension is brought to required density, 1230-1400 kg/m3 and is delivered into underground chamber at rate defined by ratio of sludge settling-to-brine forcing out speeds within 140-640. Bottom of sludge delivering tube string is set at level corresponding to middle of chamber low temperature range. EFFECT: enlarged operating capabilities. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SLUDGE WASTE DISPOSAL IN THE OPERATING UNDERGROUND SALT CHAMBER | 2014 |
|
RU2628559C2 |
METHOD OF DUMPING WASTES IN UNDERGROUND SALT CHAMBERS | 2009 |
|
RU2398639C1 |
METHOD OF EXTRACTING WASTES FROM UNDERGROUND CHAMBERS | 2009 |
|
RU2424968C1 |
METHOD OF BURIAL OF INDUSTRIAL WASTES IN UNDERGROUND SALT CHAMBER THROUGH WELLS PROVIDED WITH PIPELINES | 1994 |
|
RU2081802C1 |
METHOD FOR THERMOCHEMICAL TREATMENT OF OIL-BEARING BED | 0 |
|
SU1794181A3 |
COMPOSITION AND METHOD OF PREPARING HYDROPHOBIC EMULSION IN INTEGRATED WELL-KILLING TECHNOLOGY | 1999 |
|
RU2156269C1 |
WELL KILLING METHOD | 2004 |
|
RU2283942C2 |
TREATMENT METHOD OF PRODUCTIVE FORMATION, AND DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2010 |
|
RU2478778C2 |
METHOD OF METAL EXTRACTION FROM ORES | 2013 |
|
RU2550764C1 |
METHOD OF MINING-WELL TAR PRODUCTION AND PROCESS EQUIPMENT SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2574434C1 |
Authors
Dates
1997-12-20—Published
1996-05-21—Filed