FIELD: oil and gas industry.
SUBSTANCE: treatment method of productive formation consists in a cyclically alternating operation of repression on the formation with pumping of process fluids to the formation and depression on the formation so that an influx is caused. Wave action with elastic vibrations on treated medium is performed with a hydrodynamic generator installed in the well opposite productive interval. Values and/or creation velocities of repression and depression are adjusted in cycles. Regular wave action controlled as per amplitude-frequency parameters is performed. Monitoring of running of filtration processes, decolmatation and fracture formation in formation medium is performed, on the basis of which control parameters, wave action parameters in further cycles of repression and depression and divider of those cycles as to time are determined and assigned in a feedback mode. Values and/or velocities of creation of repression and depression in cycles are controlled with their subsequent increase. Their initial minimum values are determined and assigned depending on filtration capacitance parameters of formation medium, and at the same time, hydraulic impact pressure pulses are created from time to time in the well fluid.
EFFECT: improving efficiency of action and directed conversion of rock medium of bottomhole area and formation, and enlarging functional capabilities of the device.
9 cl, 1 ex, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
METHOD FOR HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION | 2012 |
|
RU2584191C2 |
METHOD FOR EXTRACTING HYDROCARBON DEPOSITS INCLUDING COMPLEX PHYSICAL BED STIMULATION | 2004 |
|
RU2291954C2 |
DOWNHOLE EQUIPMENT FOR POLYFREQUENCY WAVE TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION AND FLOWRATE OSCILLATIONS GENERATOR FOR THAT | 2014 |
|
RU2574651C1 |
METHOD OF DEVELOPMENT OF MINERAL DEPOSITS EXTRACTED THROUGH WELLS | 2007 |
|
RU2357073C2 |
PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION | 2007 |
|
RU2366806C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2526922C2 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF BED | 1994 |
|
RU2128770C1 |
METHOD OF PREPARING AND SUPPLYING HETEROGENEOUS MIXTURES TO FORMATION, AND PLANT FOR METHOD'S IMPLEMENTATION | 2008 |
|
RU2389869C1 |
METHOD FOR REACTANT-WAVE TREATMENT OF BOTTOMHOLE FORMATION ZONE WITH FILTRATION PRESSURE WAVES | 2014 |
|
RU2584253C2 |
Authors
Dates
2013-04-10—Published
2010-05-19—Filed