FIELD: oil and gas production industry. SUBSTANCE: according to method, injected into well is solution of acid and polyacrylamide in recovery accompanying water. Solution is pushed down by 0.05-5% solution of surface-active matter. This is performed at mode of maintaining injection pressure close to bed fracturing pressure. Technological delay is undertaken for pressure stabilization in well. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATMENT OF WATERED DOWN-HOLE ZONE OF PRODUCING WELL | 1996 |
|
RU2094603C1 |
DEVELOPMENT METHOD OF CARBONATE OIL FORMATION (OPTIONS) | 2016 |
|
RU2618547C1 |
METHOD FOR DEVELOPMENT OF MULTIPLE-BED OIL POOL | 1996 |
|
RU2084620C1 |
METHOD FOR ISOLATION OF WATER INFLOW IN HORIZONTAL OR INCLINED PRODUCING WELLS | 1997 |
|
RU2101484C1 |
METHOD FOR DEVELOPING CARBONATE RESERVOIR OF VEREISKIAN-BASHKIR TARGETS | 2022 |
|
RU2792491C1 |
METHOD FOR RAISING OUTPUT OF OIL BED IN MULTIPLE-BED DEPOSIT | 1998 |
|
RU2144615C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF WELL | 1996 |
|
RU2103494C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF OIL BED | 1997 |
|
RU2095560C1 |
CONFORMANCE CONTROL METHOD FOR INJECTION WELLS | 2004 |
|
RU2263773C1 |
METHOD FOR INTENSIFYING OIL PRODUCTION FROM DOMANIC DEPOSITS | 2023 |
|
RU2806639C1 |
Authors
Dates
1998-01-10—Published
1997-05-16—Filed