FIELD: oil production industry. SUBSTANCE: according to method, gel-creating solution of polyacrylamide and acid is injected into water inflow interval of horizontal and inclined producing wells. Aforesaid solution is pressure-forced down into bed by water of higher density. Operation is started from remote end of water inflow interval and is repeated with respect to advancing along water inflow interval. Technological delay is undertaken for creation of gel. Well is flushed with hydrocarbon liquid starting from remote end of well. Before carrying out isolation of water inflow, remote producing interval of well is filled with acid. Technological delay is undertaken at mode of bath operation, and acid is pressure-forced into bed. EFFECT: high efficiency. 1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROCESSING BOTTOMHOLE ZONE OF HORIZONTAL WELL | 2005 |
|
RU2288356C1 |
METHOD FOR WATER INFLOW ISOLATION IN NON-CASED HORIZONTAL PART OF PRODUCTION WELL BORE | 2004 |
|
RU2273722C2 |
METHOD OF LIMITING WATER INFLUX INTO EXTRACTING WELLS | 2002 |
|
RU2224875C2 |
METHOD FOR HORIZONTAL WELL OPERATION | 2011 |
|
RU2447265C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL | 1997 |
|
RU2101483C1 |
METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END | 2022 |
|
RU2794105C1 |
HORIZONTAL WELL OPERATION METHOD | 2014 |
|
RU2558090C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF OIL BED | 1997 |
|
RU2095560C1 |
METHOD FOR PROCESSING FACE-ADJACENT ZONE OF WELL | 2004 |
|
RU2260689C1 |
METHOD OF TREATMENT OF WELL BOTTOM-HOLE ZONE | 2002 |
|
RU2206731C1 |
Authors
Dates
1998-01-10—Published
1997-05-16—Filed