FIELD: bridge-building industry. SUBSTANCE: according to method, component modules of bridge half-tracks are assembled in stages with provision of 90% of open horizontal welded joints and complete exclusion of overhead (inconvenient) welded joints. In addition, succession of operations described in invention, as well as sagging of load-carrying framework together with upper decking in process of their connection by welding completely exclude warping, thus improving quality of product. There is no need of special stands, expensive manipulators which is of particular importance in manufacture of prototype models. EFFECT: high efficiency. 26 dwg
Title | Year | Author | Number |
---|---|---|---|
DOUBLE-TRACK DOUBLE-SECTION MECHANIZED BRIDGE | 1994 |
|
RU2102552C1 |
BRIDGING UNIT OF MULTIPLE-SPAN BRIDGE | 1995 |
|
RU2083757C1 |
DOUBLE-TRACK MECHANIZED BRIDGE | 2004 |
|
RU2267572C1 |
DEVICE FOR TESTING THE BRIDGING MECHANISM OF BRIDGE LAYING MACHINE | 1994 |
|
RU2097731C1 |
BRIDGE-LAYING MACHINE | 1996 |
|
RU2102556C1 |
TRANSPORT-LAUNCHING PACK FOR ROCKETS AND METHOD OF ITS MANUFACTURE | 2000 |
|
RU2166166C1 |
BRIDGE-LAYING MACHINE | 1996 |
|
RU2102555C1 |
BRIDGE CONSTRUCTION AND BRIDGE ASSEMBLY MACHINE FOR TRANSPORTATION, ASSEMBLY AND LAYING OF BRIDGE CONSTRUCTION ON OBSTACLE | 2001 |
|
RU2210656C2 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE AND DRIVE CARRIAGE (OPTIONS) | 1993 |
|
RU2057836C1 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE | 1992 |
|
RU2065515C1 |
Authors
Dates
1998-01-20—Published
1995-06-05—Filed