FIELD: bridge building. SUBSTANCE: drive is provided with a mechanism to switch off blocks of pulley block (if needed) under angle travels of bridge sections about each other. Cable of cable-block drive system is inserted in central deflecting block of roll compensator of cross-angle motion. The drive eliminates loop generation with angle motion of the section. Carriages provide coming clamp roll outside without carriage mounting and dismounting. EFFECT: improved stiffness. 12 cl, 39 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| BRIDGE BLOCK OF MULTI-SPAN BRIDGE | 1992 | 
 | RU2065515C1 | 
| INTERMEDIATE GANTRY SUPPORT OF BRIDGE | 1992 | 
 | RU2072405C1 | 
| BRIDGE INTERMEDIATE GANTRY PIER | 1991 | 
 | RU2008392C1 | 
| BRIDGING UNIT OF MULTIPLE-SPAN BRIDGE | 1995 | 
 | RU2083757C1 | 
| BRIDGE CONSTRUCTION AND BRIDGE ASSEMBLY MACHINE FOR TRANSPORTATION, ASSEMBLY AND LAYING OF BRIDGE CONSTRUCTION ON OBSTACLE | 2001 | 
 | RU2210656C2 | 
| BRIDGE-LAYING MACHINE | 1996 | 
 | RU2102556C1 | 
| METHOD FOR MANUFACTURE OF HALF-TRACKS OF MECHANIZED DOUBLE-TRACK DOUBLE-SECTION SPAN STRUCTURE OF BRIDGE UNIT | 1995 | 
 | RU2102553C1 | 
| BRIDGE-LAYING MACHINE | 1996 | 
 | RU2102555C1 | 
| DOUBLE-TRACK DOUBLE-SECTION MECHANIZED BRIDGE | 1994 | 
 | RU2102552C1 | 
| METHOD OF UNLOADING DOUBLE-TRACK SECTIONAL MECHANIZED BRIDGE FROM VEHICLE | 1996 | 
 | RU2111874C1 | 
Authors
Dates
1996-04-10—Published
1993-03-03—Filed