FIELD: oil and gas production industry. SUBSTANCE: this relates to preparing oil, gas, geothermal, and special deep wells to cementation. Improved quality of preparation is achieved due to better cleaning of well at temperatures from 5- to 300 C with simultaneous simplification of its technology. According to method, injected into well as high-viscous separator is neutralized sludge of galvanic production process with density regulator. Used as weighting material is barite concentrate. Injected as loosener of clayly crust is water solution of nitric acid manganese. Injection as abrasive-flushing liquid is water solution of nitric acid manganese with addition of self-loosening slag resulted from production of ferrochrome with hematite. Abrasive-flushing liquid also removes sedimentation. EFFECT: high efficiency. 2 cl, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL CASING | 1999 |
|
RU2178060C2 |
PLUGGING COMPOSITION | 2000 |
|
RU2179230C2 |
ROLLER BIT | 1995 |
|
RU2142550C1 |
PROCEDURE FOR FIXING WELL WITH CEMENT GROUT | 2009 |
|
RU2398955C1 |
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
METHOD OF PREPARING WELLS TO CEMENTATION | 1999 |
|
RU2137906C1 |
DEVICE FOR POWER SUPPLY TO ROOMS WITH THE USE OF LOW-POTENTIAL POWER CARRIERS | 2005 |
|
RU2292000C1 |
METHOD OF PREPARATION FOR CEMENTING OF WELLS DRILLED USING INVERT-EMULSION DRILLING MUD | 2010 |
|
RU2452849C1 |
GROUTING MORTAR | 1992 |
|
RU2082871C1 |
METHOD FOR EXTRACTION AND USE OF CONCENTRATED GEOTHERMAL BRINES | 2013 |
|
RU2535873C1 |
Authors
Dates
1998-01-20—Published
1996-03-26—Filed