FIELD: gas-and-oil industry.
SUBSTANCE: procedure for fixing well with cement grout consists in successive pumping washing spacer fluid and three portions of cement grout. As the first and the second portions of cement grout there is used cement grout of 1650-1750 kg/m3 density with erosion properties containing mixture of back-filling Portland cement and abrasive material as quartz fine dispersed sand with average grain dimension not over 1 mm in weight ratio from 100:8 to 100:10, and also poly-vinyl-spirit PVS -VR at amount of 0.4-0.6% and de-foaming agent at amount of 0.04-0.06% by cement weight. As the third portion there is used the said cement grout additionally containing calcium chloride at amount of 2% and sodium chloride at amount of 1% by cement weight of not less, than 1850 kg/m3 density.
EFFECT: raised quality of formation isolation and increased efficiency of clay coating removal.
1 ex, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
METHOD OF CEMENTATION TOP STAGE OF CASING PIPE IN WELL | 2008 |
|
RU2386013C1 |
METHOD FOR RECOVERY OF RESERVOIR NATURAL PROPERTIES, IMPAIRED DURING ITS OPENING WITH BORING | 2008 |
|
RU2382188C1 |
METHOD OF SECURING WELLS | 0 |
|
SU883334A1 |
METHOD OF ISOLATING FORMATIONS IN WELLS | 0 |
|
SU834328A1 |
METHOD OF CEMENTING CASING PIPE OF GAS WELL UNDER CONDITIONS OF PERMAFROST ROCKS | 2006 |
|
RU2342517C2 |
CASING STRING CEMENTING METHOD IN WELL | 2019 |
|
RU2720025C1 |
HYDRO-JET-MECHANICAL PROCEDURE FOR DECREASING PERMEABILITY OF WELL WALLS | 2010 |
|
RU2428560C1 |
METHOD OF PREPARING WELLS TO CEMENTATION | 1999 |
|
RU2137906C1 |
METHOD FOR PREPARATION OF WELL TO CEMENTATION | 1996 |
|
RU2102581C1 |
Authors
Dates
2010-09-10—Published
2009-05-27—Filed