FIELD: oil and gas production industry. SUBSTANCE: this relates to repair and maintenance of casing strings and improving its efficiency. According to method, zone of disturbed tightness of casing string is covered from inside of casing string by patch made of deformable pipe produced from thermoplastic material, for example polyethylene. Excess pressure is created due to expansion of self-heating and self-expanding material such as limestone mixture for mining and drilling operations. Pipe produced of thermoplastic material is filled with this mixture before covering zone of disturbed tightness of casing string. EFFECT: higher efficiency. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RESTORING TIGHTNESS OF CASING CLEARANCE | 1995 |
|
RU2108445C1 |
METHOD FOR REPAIRING CASING PIPES IN WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2752837C1 |
METHOD FOR CASING STRINGS TIGHTNESS RECOVERY AND DEVICE FOR ITS IMPLEMENTATION | 2015 |
|
RU2597597C1 |
METHOD FOR RESTORING PRESSURIZATION OF CASING COLUMNS IN WELL AND DEVICE FOR REALIZATION OF SAID METHOD | 2006 |
|
RU2289013C1 |
METHOD FOR REPAIRING INNER TUBE SURFACE AND FOR PRODUCING BAND FOR INNER TUBE SURFACE REPAIRING | 2002 |
|
RU2235188C2 |
METHOD OF SHUTOFF OF WATER INFLOW INTO WELL | 1999 |
|
RU2158351C1 |
METHOD OF INCREASE OF WELL PRODUCTIVITY | 1994 |
|
RU2079644C1 |
PROCESS OF RECONSTRUCTION OF ENTIRENESS OF DISTURBED CASING STRINGS IN HOLES DRILLED WITH DIRECTIONAL INCLINATION | 1999 |
|
RU2159841C1 |
METHOD OF RECOVERY OF CASING SEALING | 2002 |
|
RU2211305C1 |
METHOD OF WELL COMPLETION | 1993 |
|
RU2078198C1 |
Authors
Dates
1998-02-20—Published
1995-12-01—Filed